In particular where there are bad base conditions, muddy fields etc, this material is superb. After scrapping off the surface, inserting drainage tubes and a ground cloth, layer and pack the Hyttsten. When the bearing layer is spread and packed, it is ready for the top surface.
NB! Even Hyttsten 0/63 can be used.